Skyline College Project Summary
In 2001 the Facilities Planning & Operations Department of the San Mateo County Community
College District commissioned a Facilities Master Planning Process to assess the current condition of the physical environment, identify the repair/renovation
and new construction projects required to support the current and future instructional
needs of Skyline College. The 2001 Educational Facilities Master Plan is the culminating report that documents that master planning process. The first
phase of the capital improvement program (CIP1) directly addressed the most urgent
needs identified in the 2001 Educational Facilties Master Plan, in support of Skyline
College's mission.
In 2006 the District reviewed and updated the master plan. The outcome of that eight-month planning process is the 2006 Facilities Master Plan. The second phase of the capital improvement program (CIP2) will be comprised of projects identified in this updated master plan.
In 2011, the District reviewed and improved the master plan. The 2011 Facilities Master Plan enhances the original master plan.
In 2015, the District again reviewed and updated the master plan. The 2015 Facilities Master Plan amendment is intended to complete the vision started in 2001
For current information on how the Capital Improvement Construction Projects will impact the campus, click on the links below:
Project summaries are currently available for the following Skyline College Capital Improvement Construction Projects. Click on each project for more details:
Completed Projects
- SKY B19 Swing Space
- SKY B3 Portables Replacement
- CSM and Skyline Roof Replacement Project
- District Wide NoX Boiler Burner Replacment Project
- Skyline College Electrical Infrastructure Replacement/Load Center 2 Project
- Skyline CIP2 Design-Build Project
- Buildings 1 & 2 - Hazardous Substances Abatement
- Building 8 - Modernization & Seismic
- Building 2 - Phase II (CALT)
- Utility Infrastructure Upgrades
- Building 3 - Modernization & Seismic
- Athletic Facilities - Upgrades & Renovation
- Building 6/7A - Student Union/Science Wing
- Summer 2003 - Paving Improvements
- Building 7 - Allied Health, Modernization & Seismic
- Districtwide Hazardous Materials Abatement
- Facilities Maintence Center
- Corporation Yard
- Building 1 Ceramics Lab Modernization
- CIP1 ACAMS Add-On Project
- Skyline Upper Soccer Trench Drain Project
- SKY Lot L Expansion
- SKY B19 Swing
- SKY B14 Renovations
- SKY B12N Environmental Science
- SKY Fitness Parkland & Accessible Route to College Ridge
- SKY STEM Center