Buildings 16/18 Modernization

Construction Schedule:  December 2007-June 2008

Funding Source: Measure C General Obligation Bond Funds

Bid Process Documents

 

Buildings 16 and 18 form a small complex with Building 17.  The buildings are interconnected by exterior covered walkways.  The organization and orientation of these buildings reflect the original campus master plan that envisioned a much larger campus.  The three-building complex is not easily accessible from the existing campus.  Access between buildings is circuitous, and facilities tend to be replicated rather than shared.  ADA Accessibility needs to be addressed in each building.  Approach to doors is inadequate, restrooms need to be upgraded and signage needs to be replaced.  Major roof leakage has been observed at each building.  Classroom renovations will improve and consolidate teaching facilities for existing programs.