District Wide Construction Opportunities
2018 Contractor Prequalification
- 10/4/17 - Contractor Prequal Meeting Sign-in Sheet
- 10/3/17 - Contractor Prequal Meeting Presentation
- 9/15/17 - Legal Ad
- How to become a Prequalified Contractor
DW Fire Alarm Panels Upgrade Project
2016 Construction Contractor Prequalification
- 1/20/2015 - List of Prequalified Construction Contractors
- 10/29/15 - Prequalification Conference Sign-in Sheet
- 10/29/15 - Prequalification Conference Presentation
- 10/8/15 - Legal Ad
- 5/4/15 - Notice of Award
- 4/29/15 - Board Report
- 4/14/15 - Notice of Intent to Award
- 3/9/15 - Addendum 2
- 2/27/15 - Addendum 1
- 2/12/15 - Notice to Design-Build Entities
- 5/5/15 - Notice of Intent to Award
- 4/28/15 - Bid Log
- 4/21/15 - Addendum 1 (Includes Project Manual)
- 4/21/15 - Addendum 1 (Includes Plans)
- 4/10/15 - Pre-bid Conference 2 Sign-in Sheet
- 4/6/15 - Roofs/Colonnades PPT
- 4/6/15 - Pre-bid Conference Sign-in Sheet
- 4/6/15 - Advertisement for Bids
- 10/27/14 - Notice of Award
- 10/13/14 - Notice of Intent to Award
- 10/10/2014 - Bid Log
- 10/3/14 - Addendum #1
- 9/30/14 - Mandatory Pre-Bid Conference Sign-in Sheet #2
- 9/26/14 - Mandatory Pre-Bid Conference Sign-in Sheet #1
- Project Manual
- Bid Set Drawings
- 9/9/2014 - B3 Theater ACM Testing
- Reference Documents
- Bid Number 86695
- August 5, 2014 - Bid Log
- July 23, 2014 - Pre-bid Sign in sheet
- Advertisement to Bid
- Project Manual
- Plans
- October 23, 2014 - Notice of Award
- October 22, 2014 - Board Report
- October 10, 2014 - Notice of Intent to Award
- August 15, 2014 - Proposal Receipt Log
- July 15, 2014 – Addendum #1
- July 9, 2014 – Pre-Proposal Conference Sign-In Sheet
- July 2, 2014 – Pre-Proposal Conference Presentation
- June 27, 2014 – Notice to Listed Design-Build Entities
- Project Documents