District Wide Infrastructure Physical Access Controls Phase I Project

Bid No 86516
San Mateo County Community College District  

SECTION 00920

ADDENDUM NO. 3

 

SUMMARY

This document includes requirements that clarify or supercede portions of the Request for Proposal.  This Addendum is a Contract Document.

 

General

The following changes, additions and deletions shall be made to the following document(s); all other

conditions shall remain the same.

 

I.             Document 00010 – TABLE OF CONTENTS

 

REPLACE in whole Document 00010 TABLE OF CONTENTS, with the attached revised Document 00010 TABLE OF CONTENTS labeled Addendum #3 dated 12/20/05, attached herewith and made a part of this document.  Changes are indicated by text strikeout and by bold, italicized, and underlined typeface.

 

 

II.            pre-bid requests for informaiton and Clarifications

 

A.      Pre-Bid Request for Information from NetVersant, David Sierra, on 12/17/05.

 

QUESTION:

I have been looking on the CSM website find out the names and contact information for the qualified C-10 contractors for the CSM project…Can you please email him the qualified contractors info or let him know were he could find that info please?

RESPONSE:

Bidding information may be seen at the District’s website for this project at this website address: http://www.smccd.edu/accounts/facilities/planconstruct/DW_NTC.html 

The list of C10 contractors who are Pre-Qualified to bid to the District and who did successfully attend one of the three mandatory pre-bid conferences is as follows, listed alphabetically:

 

Atlas/Pellizzari Electric

450 Howard Street

Redwood City, CA 94063

Tel 650.364.1204

Fax 650.364.6193

Contact: Jordan Sink, PM

Email: jordans@atlas-pellizzari.com

 

Cupertino Electric

1132 N. 7th Street

San Jose, CA 95112

Tel 408.808.8000

Fax 408.275.8575

Contact: Rick Davies, Estimator

email: rick_davies@cei.com

 

Del Monte Electric

6998 Sierra Court

Dublin, CA  94568

Tel 925.829.6000

Fax 925.829.6033

Contact: Nate Wood, PM x 117

email: nwood@delmonteelectric.com

 

Liberty Electric

831 Malcolm Road

Burlingame, CA 94010

Tel 650-652-4744

Fax 650-652-4745

Contact: Dave Pease, VP

email: davep@libertyelectric.com

 

All subcontractor integrator vendors who are interested in bidding on this project, should send the required AMAG qualifications (the Letter and Global Certifications) to these four C10 contractors.  As per Addendum #1, the C10 contractors are required to submit to the District the AMAG qualifications from all of the possible subcontractors.  These qualification submittals do not limit or commit any one subcontractor to any one C10 contractor in any way.  On bid day, any C10 contractor may solicit sub-bids from any Pre-Qualified subcontractor integrator vendor.

 

 

 

 

END OF ADDENDUM #3

 

SECTION 00010

(Revised by Addendum #3 dated 12/20/05)

Table of Contents

 

INTRODUCTORY INFORMATION

 

Section

Title

 

 

00001

Title Page

00007

Seals Page

00010

Table of Contents

00015

List of Drawings

 

BIDDING REQUIREMENTS

 

Section

Title

 

00100

Advertisement to Bid

00200

Instructions to Bidders

00201

Bid Submittal Vicinity Map

00210

Indemnity and Release Agreement

00320

Reports, Surveys and Existing Conditions

00400

Bid Form

00411

Bond Accompanying Bid

00430

Subcontractors List

00450

Statement of Qualifications for Construction Work

00460

Schedule of Major Equipment and Materials Suppliers

00481

Non-Collusion Affidavit

00482

Bidder Certifications

00485

Key Personnel

 

CONTRACTING REQUIREMENTS

 

Section

Title

 

 

00505

Notice of Intent to Award for Construction

00510

Notice of Award

00520

Agreement

00550

Notice to Proceed

00610

Construction Performance Bond

00620

Construction Labor and Material Payment Bond

00630

Guaranty

00650

Agreement and Release of Any and All Claims

00660

Substitution Request Form

00670

Escrow Bid Documents

00680

Escrow Agreement for Security Deposits in Lieu of Retention

 


CONDITIONS OF THE CONTRACT

 

Section

Title

 

 

00700

General Conditions

00800

Supplementary Conditions

00805

Supplementary Conditions – Hazardous Materials

00821

Insurance

00822

Apprenticeship Program

00900

Addenda Addendum #1

00910

Addendum #2

00920

Addendum #3

 

SPECIFICATIONS

 

Division 1 - General Requirements

 

Section

Title

 

 

01100

Summary of Work

01120

Allowance

01200

Measurement and Payment

01250

Modification Procedures

01315

Project Meetings

01320

Progress Schedules and Reports

01330

Submittal Procedures

01350

Special Procedures

01375

Web-based Project Management System

01385

Labor Compliance Program

01395

Project Labor Agreement

01410

Regulatory Requirements

01411

Regulatory Requirements – Hazardous Materials

01420

References and Definitions

01455

Testing and Inspection

01500

Temporary Facilities and Controls

01540

Site Security and Safety

01580

Project Identification and Signs

01600

Product Requirements

01715

Existing Underground Facilities

01740

Cleaning

01770

Contract Closeout

01780

Project Record Documents

 

 

Division 13 – Special Construction

 

Section

Title

 

 

13700

Basic Security Requirements

13710

Access Controls & Alarm Monitoring System (ACAMS)

13770

Security System Cabling

13780

Security System Labeling

13790

Security System Commissioning

16010

Basic Electrical Requirements

16050

Basic Electrical Materials and Methods

END OF SECTION