•Work Completed
•Underground piping repairs at CSM & Skyline College (Phase 1)
•Lighting retrofits at all campuses
•Boiler repairs and preventative maintenance at all campuses
•Variable flow pumping retrofits at all three campuses
•KCSM/Sutro Tower DTV transmitter installation
•Co-gen plant construction at CSM & Skyline College
•Air handling system refurbishments at all three campuses
•Installation of new control system at all three campuses
•Installation of Utility Vision real-time monitoring and metering
platform at all three campuses
•
•