- Overview Current CIP Projects
- Caρada College Project Update
- College of San Mateo Project Update
- Skyline College Project Update
- Energy Efficiency Projects
- Technology Update (Jim Petromilli)
- Q & A
|
3
|
- CAN Energy Efficiency Projects
- CAN Athletic Facilities
- CAN Bldg 9 Learning Resource Center
- CAN Bldg 2 Bookstore
- CAN Bldg 16/17/18 Modernization
- CAN Zone Controls
- CAN Access Controls
- CAN Smart Classroom Technology
- CAN Bldg 5 Waterproofing Membrane/ADA Ramps/Landscaping
- CAN Fire Alarm Upgrade
- CAN Chiller Upsizing
- CAN Quad Landscaping
|
4
|
|
5
|
|
6
|
|
7
|
|
8
|
|
9
|
|
10
|
|
11
|
|
12
|
|
13
|
|
14
|
|
15
|
|
16
|
|
17
|
|
18
|
|
19
|
- SKY Energy Efficiency Projects
- SKY Athletics Facilities Upgrades
- SKY Bldg 3 Seismic & Modernization
- SKY Haz Mat Removal
- SKY Bldg 6/7A Student Union & Science Wing
- SKY Bldg 8 Seismic & Modernization
- SKY Swing Space (Bldg 19/Pacific Heights)
- SKY Bldg 1 - Summer 05 Facelift
- SKY Bldg 2 Modernization
- SKY Utility Infrastructure Upgrade
- SKY Hot Water Loop Repairs
- SKY Parking Lot 8 & 9 Drainage and Entry
- SKY Gas Line Relocation at Portable 3D
- SKY Loop Road Closure
- SKY Bldg 9 & 10 Roofing
- Campus Wide Exterior Painting
- SKY Access Controls
- SKY Parking/Sidewalk Upgrade
|
20
|
|
21
|
|
22
|
|
23
|
|
24
|
|
25
|
|
26
|
|
27
|
|
28
|
|
29
|
|
30
|
|
31
|
- Work Completed
- Underground piping repairs at CSM & Skyline College (Phase 1)
- Lighting retrofits at all campuses
- Boiler repairs and preventative maintenance at all campuses
- Variable flow pumping retrofits at all three campuses
- KCSM/Sutro Tower DTV transmitter installation
- Co-gen plant construction at CSM & Skyline College
- Air handling system refurbishments at all three campuses
- Installation of new control system at all three campuses
- Installation of Utility Vision real-time monitoring and metering
platform at all three campuses
|
32
|
- Work Completed By the Numbers
- Light Fixtures Retrofitted Phase 1 & 2
- Canada 4,065
- Skyline 668
- CSM 4,818
- Air Handlers Refurbished
- Canada 27
- Skyline 32
- CSM 54
- Heat/Vent Units Refurbished
- Canada 26
- Skyline 163
- CSM 117
|
33
|
- Work Completed By the Numbers
- Boilers Re-tubed
- Underground Piping Replacement
- Skyline 160 feet of pipe, 4 valves
- CSM 46 feet of pipe, 54 valves, 9 expansion compensators
- Caρada 450 feet chilled water piping
- EMS Control Points Connected & Functioning
- Caρada 248 of 704
- Skyline 600 of 633
- CSM 675 of 1,555
|
34
|
- Utility Savings to Date (Including Co-Gen Units)
- Water
- 11,000 gallons of water per day (100% of target)
- Cost savings = $14,332 per year
- Electricity
- 6,795,434 kWh per year (94% of target)
- Cost savings = $793,625 per year
- Natural Gas
- 108,485 therms per year (81% of target)
- Cost savings = $54,242 per year
|
35
|
- Rebates Received to Date:
- $878,557 October 2004
- $54,825 September 2003
- $102,600 April 2003
- _______________________________
- $1,035,982
|
36
|
|
37
|
- Piping repairs at CSM & Skyline College
|
38
|
- Damaged Piping at CSM & Skyline College
|
39
|
|
40
|
- Pump retrofits at Canada College
|
41
|
|
42
|
|