Skip to contentSkip to main navigationSkip to local navigation

No Heat or Hot Water in Buildings 16 and 19

The District is installing utility consumption meters to buildings throughout the campus to document and analyze utility usage, to improve electrical, gas, and water resource management.


April 3rd, 2015 - April 3rd, 2015

Friday, April 3


At Buildings 16 and 19, you may experience cooler than usual air flow in the buildings.  The heating hot water loop will be cooled in order to install meters into the lines.