CSM Building 36 Report of Additional Scope Requests
as of August 18, 2006
This report lists the items, identified by faculty and staff, which need additional attention. These items were not in the design-builder’s contract, so they are tracked as additional scope requests. A separate listing of contract items needing remediation is available at http://www.smccd.edu/accounts/facilities/maintoperation/CSMB36Punchlist.htm.
This report provides transparency in the process of vetting and implementing additional scope requests. This report includes items reported initially to Swinerton Management & Consulting, as well as items submitted to the Facilities HelpCenter. When an additional scope request is received, it is reviewed for constructability, cost and relative benefit to the Science curriculum. Priority levels are assigned based on these criteria, from 1 (high priority) on down.
Items are listed in order of status:
· Approved: these items have been approved, funding has been identified, and an estimated date of completion is shown.
· Pending: these are items for which solutions have yet to be identified, or the identified solutions have been targeted for implementation at a future date.
· Not Approved: requestors have withdrawn their requests, approval of other requests have voided the necessity of implementing these requests, or the priority level does not warrant the expense associated with a particular request.
If you have identified an additional scope request and do not see it on this list, please submit the request to the Facilities HelpCenter (look for the link on the left navigation bar). Requests received prior to September 22, 2006 will be considered. As additional scope requests are received, this report will be updated periodically.
|
Item # |
Date Requested |
Room # |
Room Name |
Description of request |
Requested by |
Approved |
Estimated Date of Completion |
Comments |
Priority |
|
101 |
2/22/2006 |
109, 207 |
Lecture |
Instructor at desk blocks projector screen. Extend top by 2' maintaining overhangs; extend chase along back but provide kneespace on front and side |
Jim Petromilli |
Y |
8/25/06 |
|
1 |
|
102 |
2/22/2006 |
215 |
Lecture |
Instructor at desk blocks projector screen. Relocate screen and projector 6' towards window |
Jim Petromilli |
Y |
Completed 8/4/06 |
|
1 |
|
102a |
2/22/2006 |
319 |
Lecture |
Instructor at desk blocks projector screen. Relocate screen and projector 2' towards window; locate projector in front of light fixture (towards front of rm). Extend top by 2' away from window (and sink) maintaining overhangs; add 2' cabinet w/o drawer |
Jim Petromilli |
Y |
8/25/06 |
Projector, screen have been relocated. Pending desk extension |
1 |
|
106 |
2/16/2006 |
112, 114, 125, 109 |
Physics lab + 1st fl lecture |
Change whiteboard to chalkboard (24'x4' per rm) |
David Locke |
Y |
9/1/06 |
|
1 |
|
109a |
2/16/2006 |
112, 114, 125 |
Physics lab |
Exposed plywood backing- 1/4" sheetrock, tape, paint (6 locations total) |
David Locke |
Y |
Completed 8/3/06 |
|
1 |
|
110 |
2/16/2006 |
119 |
ES lab |
Provide (2) additional panels of sliding horizontal whiteboards. |
Linda Hand |
Y |
9/30/06 |
|
1 |
|
110a |
2/16/2006 |
119 |
ES lab |
Remove 1 panel vert sliders from each bay, total 3 |
Linda Hand |
N |
X |
Request withdrawn 8/11 |
1 |
|
116 |
2/16/2006 |
200, 223 |
Botany lab, zoology |
Provide stop at end of the one student table adjacent to AV cabinet |
Kim Meyer |
Y |
9/15/06 |
|
1 |
|
118a |
2/16/2006 |
200A |
Botany Prep |
Provide 72" x 30" metal frame table w/ epoxy top |
Tania Beliz |
Y |
9/1/06 |
|
1 |
|
|
|
|
|
|
|
N |
X |
Done- per contract |
|
|
109 |
2/16/2006 |
112, 114, 125 |
Physics lab |
Exposed plywood backing- wrap with fabric (6 locations total) |
David Locke |
N |
X |
Select drywall option. See Item 109A |
2 |
|
119 |
2/16/2006 |
200A |
Botany Prep |
Provide 8 duplex GFI outlets |
Tania Beliz |
Y |
Completed 7/28/06 |
|
1 |
|
120 |
2/16/2006 |
204 |
Microbiology |
Provide supply of screens for cup sinks. Include 100 shelf clips |
Kim Meyer |
Y |
9/15/06 |
|
1 |
|
122 |
2/16/2006 |
206 |
Bio Stockroom |
Provide shallower counter; 24" similar to Chem stockroom |
Kim Meyer |
Y |
Completed |
|
1 |
|
123 |
2/16/2006 |
206C |
Culture Prep |
Add duplex in southwest corner of room for mini fridge and incubator |
Kim Meyer |
Y |
Completed 7/28/06 |
|
1 |
|
|
|
|
|
|
|
N |
|
|
|
|
124 |
2/16/2006 |
217 |
Anatomy Lab |
Change knob type fixture handles to lever type at one sink. |
Theresa Martin |
Y |
9/15/06 |
|
1 |
|
|
|
|
|
|
|
N |
|
Punchlist item |
|
|
126 |
2/16/2006 |
223 |
Zoology lab |
Install locks at drawers and base cabinets throughout except along window |
Kim Meyer |
N |
X |
See Item 136 |
1 |
|
127 |
2/16/2006 |
306, 321, 329 |
Chem lab |
Add water, sink, gas to instructors bench |
Kate Deline |
Y |
9/8/06 |
|
1 |
|
130 |
3/22/2006 |
105, 205, 305 |
Open offices |
Replace open office 3'x4' whiteboards with 8'w x 4' |
Mike Claire |
Y |
9/30/06 |
|
1 |
|
133 |
5/11/2006 |
|
hallways |
Install (8) 4'w x 3'h lockable solution key display cases in hallways (5)- 1st fl, (3)- 3rd fl |
Barbara Uchida, Linda Hand, Kate Deline |
Y |
9/30/06 |
|
1 |
|
134 |
5/11/2006 |
309 |
|
Millwork, power, data associated w/ copier |
Vic Krimsley |
Y |
Completed 7/28/2006 |
|
1 |
|
135 |
6/19/2006 |
206A |
Media prep |
Add (1) gas turret |
Kim Meyer |
Y |
Completed 8/11/06 |
|
1 |
|
136 |
6/20/2006 |
223 |
Zoology lab |
Install locks at drawers and base cabinets throughout room |
Kim Meyer |
Y |
9/30/06 |
|
1 |
|
137 |
6/20/2006 |
223 |
Zoology lab |
Change doors on upper pair of tall cabinets from solid wood to glass |
Kim Meyer |
Y |
9/30/06 |
|
1 |
|
138 |
6/20/2006 |
204 |
Microbiology |
Remove recessed fire extinguisher cabinet to allow for refrigerator; relocate fire extinguisher |
Kim Meyer |
Y |
8/25/06 |
Pending paint |
1 |
|
139 |
6/20/2006 |
206A, 218 |
Bio Stockroom |
Add pegboard over two sinks (1/rm) |
Kim Meyer |
Y |
9/30/06 |
|
1 |
|
141a |
6/20/2006 |
302 |
O chem lab |
Add 1 ice machine- undercounter (opg 35.5wx30.25h x 29"d); crushed ice |
Vic Krimsley |
Y |
|
|
1 |
|
141b |
6/20/2006 |
306 |
Chem lab |
Add 1 ice machine |
Vic Krimsley |
Y |
|
|
1 |
|
142 |
6/20/2006 |
123 |
Physics Stockroom |
Provide 4 extra shelves total for 48" cabinet |
David Locke |
Y |
9/30/06 |
|
1 |
|
143 |
7/7/2006 |
|
lecture and labs |
Provide 1 extra shelf for each AV cabinet; total 16 |
Jim Petromilli |
Y |
9/30/06 |
|
1 |
|
144 |
7/7/2006 |
300 |
O-chem lab |
Provide extra shelves (10) 18"w cabinet x 17" d, (4) 30" cabinet x 21"d |
Yin Mei Lawrence |
Y |
9/30/06 |
|
1 |
|
145 |
7/7/2006 |
300 |
O-chem lab |
Add open shelving unit for backpack storage; 4'-9"x 6'h x 24"d w/ 3 adj shelves |
Yin Mei Lawrence |
Y |
9/30/06 |
|
1 |
|
146 |
7/7/2006 |
300 |
O-chem lab |
Add pedestal file cabinet. Modify brace at mobile table to accommodate cabinet. |
Yin Mei Lawrence |
Y |
|
Verify whether bracing can be modified |
1 |
|
149 |
7/12/2006 |
123, 112, 114, 125 |
Physics stockroom and labs |
Add flex hose (1/rm) |
David Locke |
Y |
|
|
1 |
|
150 |
7/3/2006 |
311A |
Division Office stockroom |
Provide low bookcase units |
Isabel Dillman |
Y |
Completed 8/11 |
|
1 |
|
114 |
2/16/2006 |
123 |
Physics Stockroom |
Prevent shelves from sliding |
Violeta Grigorescu |
Pending |
|
Install screw at clip when shelf heights are established |
3 |
|
107 |
2/16/2006 |
112, 114 |
Physics lab |
Revise framing and casters for (20) mobile tables for better height adjustability |
David Locke |
Pending |
|
Design-build team is developing solutions for SMCCCD approval |
tbd |
|
112 |
2/16/2006 |
119 |
ES lab |
Lower hinge interferes with two table group layout unless tables are turned back to back. Routed hinge would need to be raised by 1/4". |
Linda Hand |
N |
X |
Request withdrawn 7/31; tables will be used back to back |
x |
|
117 |
2/24/2006 |
200, 223 |
Botany lab, zoology |
Add (30/rm) pull out writing boards to student tables. Use 8"w x 16" long. |
Tania Beliz, Michael Bucher |
Pending |
|
|
tbd |
|
140 |
6/20/2006 |
206C |
Culture Prep |
Install shelf for small incubator |
Kim Meyer |
Pending |
|
Review options |
|
|
148 |
7/12/2006 |
125 |
Optics Lab |
Shorten aluminum lattice rods to 30". Refab/ modify laser curtains. |
David Locke |
Pending |
|
|
|
|
128c |
2/24/2006 |
400 |
Observatory |
Install laminate tops with backsplash |
Darryl Stanford |
Y |
|
Tempered masonite is Contractor-recommended material for application |
tbd |
|
128d |
2/24/2006 |
400 |
Observatory |
Install whiteboard or tackboard |
Darryl Stanford |
Y |
|
|
tbd |
|
|
|
|
|
|
|
N |
X |
As- built layout acceptable to faculty |
x |
|
104 |
2/22/2006 |
306, 321, 329 |
Chem labs |
Instructor at desk blocks projector screen. Option A- relocate desk 7" to west |
Jim Petromilli |
N |
X |
Shift limited by 48" ADA clearance |
x |
|
104 |
2/22/2006 |
306, 321, 329 |
Chem labs |
Instructor at desk blocks projector screen. Option B- shift screen and projector 2' to east |
Jim Petromilli |
N |
X |
|
x |
|
111 |
2/16/2006 |
119 |
ES lab |
Change at least one panel in each set of vertical sliders from whiteboard to chalkboard |
Linda Hand |
N |
X |
|
x |
|
118 |
2/16/2006 |
200A |
Botany Prep |
Add 3'x4', mobile, water resistant table. Prep room has stainless steel casework. |
Tania Beliz |
N |
X |
|
x |
|
121 |
2/16/2006 |
204 |
Microbiology |
Provide (2) vacuum turrets on each student table. Currently there are aspirators on water gooseneck |
Kim Meyer |
N |
X |
Request withdrawn. Will use vacuum in bio safety cabs |
x |
|
125 |
2/16/2006 |
217 |
Anatomy Lab |
Provide one set of vertical sliding white boards |
Theresa Martin |
N |
X |
|
x |
|
128 |
2/24/2006 |
400 |
Observatory |
Install tall splash at cabinets to prevent objects from falling between exposed studs |
Darryl Stanford |
N |
X |
|
x |
|
128a |
2/24/2006 |
400 |
Observatory |
Galvanized metal tops for millwork (to match doors) |
|
N |
X |
Prefer laminate (warmer temp) material |
x |
|
128b |
2/24/2006 |
400 |
Observatory |
Enclose interior face of walls to conceal exposed studs |
|
N |
X |
Per DS, splash, laminate tops, and whiteboards/tackboards may be sufficient. |
x |
|
131 |
4/5/2006 |
333 |
Mech rm |
Install trap for vacuum pump |
Bob Kowerski |
N |
X |
Get letter from lab consultant or WAM |
x |
|
132 |
4/5/2006 |
|
all labs |
Install (11) privacy curtains at emergency showers |
Bob Kowerski |
N |
X |
|
x |
|
147 |
7/7/2006 |
300 |
O-chem lab |
Add (3) port data jack |
Yin Mei Lawrence |
N |
X |
Request withdrawn. |
|
|
M0608079 |
8/9/2006 |
105B & other offices |
|
Locking mechanism should be changed so that key entry leaves the door in the locked position. |
Locke, David |
|
|
|
|
|
M0608045 |
8/4/2006 |
125 |
|
Change wiring between switches and light fixtures to be consistent with the orientation of the room. There is a switch that turns on the lights to the far right of the room (away from the doors). This switch should operate lights in the back of the room (opposite the board and instructor desk). This is something I noticed while trying out the projector in that room. |
Locke, David |
|
|
|
|
|
M0608024 |
8/3/2006 |
105 |
|
Provide a 2' by 5' height adjustable table for working with students during office hours. Size of ''desk'' or L-table provided in offic is insufficient in its shape. |
Locke, David |
|
|
|
|
|
M0608023 |
8/3/2006 |
105, 105B, 123 |
|
Provide lighter colored shades for faculty offices and stockroom. Black shades absorb heat and reradiate it. I have noticed the heat coming off of the shades in my office. A lighter colored shade (perhaps matching the wall color) would provide a much better working environment when the shade is down to cut glare. |
Locke, David |
|
|
|
|
|
M0608017 |
8/3/2006 |
Offices & Class rooms |
|
All the computers need security cables; we have many walk-through thefts on campus that are never reported. We also have gangs - students complain. The office computers in Bldg 36 are not secure, and anyone can walk off with them. |
Whyte, Wendy |
|
|
|
|
|
M0606620 |
7/21/2006 |
305B |
|
Could I please have at least four coat hooks on the back of my office door to hang my coats, my lab coat and my umbrella? |
Deline, Kate (Charlotte) |
|
|
|
|
|
M0606614 |
7/20/2006 |
305B |
|
I would like an additional bookcase in my office if there is a new one that is the same size as the bookcase in my office already. |
Deline, Kate (Charlotte) |
|
|
|
|
|
M0606612 |
7/20/2006 |
36-206 |
|
Kim Meyers is supposed to have her office in the biology prep area. Because of the location of the emergency shower and eyewash, there is no longer sufficient space for her to have a regular desk, shelves or working area. We have walked the space several times. The only solution is to move the eyewash and shower to allow for proper space for a desk, chair and shelves. You can get additional information from Kim Meyer at ext 6245. |
Frontiera, Charlene |
|
|
|
|
|
M0608111 |
7/28/2006 |
18-3rd fl |
|
I have been using the observatory for a few nights and there is one glaring source of light pollution. It is coming from the 3rd floor hallway of building 18. I notice that there are 2 lights on the 3rd floor hallway, one relatively close to the window and one a little farther into the hallway. You could come up to the observatory roof during the day and see for yourself. Of course, it won't be as glaring during the day, but the light is still quite evident. Is there any way that the light closest to the window be turned off or shielded or covered with red cellophane or something? Or, maybe a dark shield could be installed, directing the light downward. The sky at he observatory is relatively dark, with the exception of that light. |
Stanford, Darryl |
|
|
President's Cabinet has approved the installation of window film from the top window mullion to the roof to cut the glare. Diane Martinez is coordinating estimating/scheduling/install. |
Y |
|
M608043 |
8/6/2006 |
105B |
|
Provide dividers for ''clamshell''. The clamshell is built with slots for dividers and is not very usable without them. Please provide dividers. Also provide dividers for rolling drawer unit. |
Locke, David |
|
|
|
|
|
M0608112 |
8/14/2006 |
119B |
|
No lighting in display case |
Hand, Linda |
|
|
|
|
|
M0608102 |
8/15/2006 |
110 |
|
Requesting a rectangular table for the ISC. Approximately 2'x6'x30" |
Stanford, Darryl |
|
|
|
|
| 8/18/2006 | All | Change glides to pressure fit casters on all lab stools | Charlene Frontiera | pending |