Skyline Facilities Maintenance Center
Contact Information:
Project Manager:
Zak Conway
Telephone: 650-738-7042
E-Mail: conwayz@smccd.edu
Project Assistant:
Tina Montano
Telephone: 650-738-7041
E-Mail: montanot@smccd.edu
Architect:
BSA, Bunton Clifford Assoc.
General Contractor:
John Plane Construction
Schedule:
- Design Phase: Oct. 2006 – Sept. 2008
- Bidding Phase: Sept. 2008 – Oct. 2008
- Construction Phase: February 2008 - December 2008
- End of Project: January 2009
Funding Source (s):State Capital Outlay and Measure A
Business Opportunities

Description:
The existing deteriorated Facilities Maintenance Center (FMC) at Skyline College will be replaced with the construction of a new sustainable FMC. The new FMC will include shop areas, such as a wood shop, electrical shop, and automotive shop, which will be served by a new and upsized electrical service. A carport for vehicle storage as well as a fueling station and car wash will be built along with the Facilities Maintenance Center. It is the goal of this sustainable project to build the FMC as a LEED Silver Certified building. 14,450 gsf.
Benefits:
The existing structures were originally used as Coast Guard Barracks and have been adapted in a piecemeal fashion in an attempt to suit the needs of the Facilities and Maintenance Department. They have outlived their useful life and are in a state of major disrepair and deterioration. They new facilities will allow the staff to function in an efficient and safe environment to be able to better serve the college.
Status: Demolition complete. Construction started 2/4/08 |