16 2005 1003 Elevator Shaft Work * 800 x 600
17 2005 1003 Existing Elevator Shaft * 800 x 600
18 2005 1003 Roof Tear Off * 800 x 600
19 2005 1110  B8 pour * 800 x 600
20 2005 1116 Hard working Drillers * 400 x 600
  16 2005 1003 Elevator Shaft Work  
  17 2005 1003 Existing Elevator Shaft  
  18 2005 1003 Roof Tear Off  
  19 2005 1110 B8 pour  
  20 2005 1116 Hard working Drillers  
21 2005 1116 Pier 4 Cage Rigging * 400 x 600
22 2005 1116 Third Floor Rigging * 896 x 597
23 2005 1116 Winch * 400 x 600
24 2005 1205 2 * 896 x 597
25 2005 1205 3 * 400 x 600
  21 2005 1116 Pier 4 Cage Rigging  
  22 2005 1116 Third Floor Rigging  
  23 2005 1116 Winch  
  24 2005 1205 2  
  25 2005 1205 3  
26 2005 1205 4 * 400 x 600
27 2005 1205 5 * 896 x 597
28 2005 1205 * 896 x 597
29 2005 1213 B8 1 * 800 x 600
30 2005 1213 B8 2 * 450 x 600
  26 2005 1205 4  
  27 2005 1205 5  
  28 2005 1205  
  29 2005 1213 B8 1  
  30 2005 1213 B8 2  