HOME  »  Skyline College Building 3 Construction Photos »  Viewing 05 Infrastructure rerouting     [Image 5 of 62]  :: Jump To  
  First slide Previous slide      No EXIF Info Index Page Start/Stop the slide show      Next slide Last slide  
01 1st floor corridor before drywall * 612 x 462

02 Area of restroom addition before construction * 612 x 462

03 Completed streel truss in gymnasium * 612 x 462

04 Gymnasium ceiling before construction * 612 x 462

Next slide
 
05 Infrastructure rerouting.jpg - 612 x 462 - (66KB)
07/20/2009 13:46
06 Installation of manholes * 612 x 462

07 Manhole and retaining wall footing @ new restroom * 612 x 462

08 Multi-purpose room before construction * 612 x 462

09 Multi-purpose room wall plates * 612 x 462

10 Roof after demolition and structural upgrades * 612 x 462

Album last updated on 07/20/2009 15:20
©2009 San Mateo County Community College District