Return to Photo Gallery
Skyline Building 8 Modernization
01 2005 0909 1st Flr demo (1)
02 2005 0909 1st Flr demo (2)
03 2005 0916 Classroom wall demo
04 2005 0916 Existing wall studs
05 2005 0916 First Floor Bathroom
06 2005 0916 Hallway conduits first floor
07 2005 0920 access road (1)
08 2005 0920 access road
09 2005 0922 access road (1)
10 2005 0922 access road
11 2005 0930 Bathroom Riser
12 2005 0930 Existing Penetrations
13 2005 0930 Plaster framing above ceiling
14 2005 0930 Plaster surrounds existing pipes
15 2005 0930 Wall above ceiling
16 2005 1003 Elevator Shaft Work
17 2005 1003 Existing Elevator Shaft
18 2005 1003 Roof Tear Off
19 2005 1110 B8 pour
20 2005 1116 Hard working Drillers
21 2005 1116 Pier 4 Cage Rigging
22 2005 1116 Third Floor Rigging
23 2005 1116 Winch
24 2005 1205 2
25 2005 1205 3
26 2005 1205 4
27 2005 1205 5
28 2005 1205
29 2005 1213 B8 1
30 2005 1213 B8 2
31 2005 1213 B8 3
32 2005 1213 B8 4
33 2005 1213 B8 5
34 2005 1213 B8 6
35 2006 0113 B8 1st flr (01)
36 2006 0113 B8 1st flr (02)
37 2006 0113 B8 1st flr
38 2006 0113 B8 3rd flr (01)
39 2006 0113 B8 3rd flr
40 2006 0203 B8 1st flr (1)
41 2006 0203 B8 1st flr
42 2006 0203 B8 2nd flr
43 2006 0203 B8 3rd flr
44 2006 0206 B8 elev.
45 2006 0208 B8 elev.
46 Picture 001
47 Picture 002
48 Picture 003
49 Picture 004
50 Picture 005
51 Picture 006
52 Picture 007
53 Picture 008
54 Picture 009
55 Picture 010
56 Picture 011
57 Picture 012