HOME  »  Skyline Building 3 Gymnasium  (62 Slides)     [Page 3 of 5] :: Jump To  
  First page Previous page      HOME      Next page Last page  
31 Area of restroom addition before construction
32 New Restroom Addition
33 Restroom Addition looking east
34 Restroom Pad
35 New Offices ductwork
  31 Area of restroom addition before construction  
  32 New Restroom Addition  
  33 Restroom Addition looking east  
  34 Restroom Pad  
  35 New Offices ductwork  
36 Team rooms being framed
37 Women's Locker room
38 Fire smoke dampers @ Video Rm
39 Hydronic piping @ Video Rm for heating coils
40 Inserting a door in an exiting plaster wall
  36 Team rooms being framed  
  37 Women's Locker room  
  38 Fire smoke dampers @ Video Rm  
  39 Hydronic piping @ Video Rm for heating coils  
  40 Inserting a door in an exiting plaster wall  
41 Inside the Video Rm
42 Lavoratories in Men's Shower Rm.
43 Looking down the corridor to the Men's team rooms
44 Looking down the main corridor on 1st floor
45 Men's Toilets
  41 Inside the Video Rm  
  42 Lavoratories in Men's Shower Rm.  
  43 Looking down the corridor to the Men's team rooms  
  44 Looking down the main corridor on 1st floor  
  45 Men's Toilets  
Album last updated on 11/9/06 9:54 AM
Powered by JAlbum 6.5 and BluPlusPlus skin
© 2006 San Mateo County Community College District