HOME  »  Skyline Building 3 Gymnasium  (62 Slides)     [Page 1 of 5] :: Jump To  
  You have reached the first page You have reached the first page      HOME      Next page Last page  
01 1st floor corridor before drywall
02 Area of restroom addition before construction
03 Completed streel truss in gymnasium
04 Gymnasium ceiling before construction
05 Infrastructure rerouting
  01 1st floor corridor before drywall  
  02 Area of restroom addition before construction  
  03 Completed streel truss in gymnasium  
  04 Gymnasium ceiling before construction  
  05 Infrastructure rerouting  
06 Installation of manholes
07 Manhole and retaining wall footing @ new restroom
08 Multi-purpose room before construction
09 Multi-purpose room wall plates
10 Roof after demolition and structural upgrades
  06 Installation of manholes  
  07 Manhole and retaining wall footing @ new restroom  
  08 Multi-purpose room before construction  
  09 Multi-purpose room wall plates  
  10 Roof after demolition and structural upgrades  
11 Roof work prior to demolition
12 Sanitary Sewer and Storm Drain Manhole
13 Steel angles in gym
14 Storm drain tie-in
15 Trusses going into gym
  11 Roof work prior to demolition  
  12 Sanitary Sewer and Storm Drain Manhole  
  13 Steel angles in gym  
  14 Storm drain tie-in  
  15 Trusses going into gym  
Album last updated on 11/9/06 9:54 AM