Hi everyone – me again – I’m not going to let you get away for the summer without some more Construction Notices.
Starting on Tuesday, May 29 thru Friday, June 1 – we will be having new stair treads and vinyl flooring installed on the interior stairways of Building 3 and Building 8. This means you will not be able to use those stairways to access the different floors in Buildings 3 and 8.
During this period, access between floors in Building 3 will have to be via the outside elevator or the multiple outside entries at both levels. Both interior stairways in Building 3 will be closed.
During this period, access between floors in Building 8 will have to be via the new elevator in the hallway between Building 7 and 8, or the stairways in Building 7.
I apologize for this temporary inconvenience. Thanks -