From: Inokuchi, Richard
Sent: Monday, January 10, 2005 12:02 PM
To: Inokuchi, Richard; Skyline Employees; 'Scott Munns'; 'Phil Smith-Hanes'; 'mreinhardt@ci.sanbruno.ca.us'; 'Mirella Ramirez'; 'kpschirrer@ci.sanbruno.ca.us'; 'Jennifer Shapona'
Cc: Da Silva, Linda L.; Nuñez, José; Nielsen, Elisabeth; Miller, Alan; Christensen, Barbara
Subject: RE: Construction Notice - Water Shut Down - January 12 (amended)

Folks – my error in the text of the message – there will not be any water on Wednesday, January 12, from 5am to 9am.   Sorry for the original confusion.


From: Inokuchi, Richard
Sent: Monday, January 10, 2005 11:49 AM
To: Skyline Employees; Scott Munns; Phil Smith-Hanes; mreinhardt@ci.sanbruno.ca.us; Mirella Ramirez; kpschirrer@ci.sanbruno.ca.us; Jennifer Shapona
Cc: Da Silva, Linda L.; Nuñez, José; Nielsen, Elisabeth; Miller, Alan; Christensen, Barbara
Subject: Construction Notice - Water Shut Down - January 12

Hello everyone – the City of San Bruno Public Works Department has been working diligently to install a new main water meter between Parking Lots 1 and 9.  The last thing to be done is to make the connections to the campus water system and then conduct water line testing.  In order to do so, the main water feed onto campus will have to be shut down temporarily.  We’ve asked the City of San Bruno’s Water Division to conduct this work to minimally impact as much as possible those of us working on campus.  The City has assured us that the work will be completed in an expeditious manner and they apologize for the temporary inconvenience.

There will be NO WATER supply throughout the campus on Wednesday, January 10 from 5am to 9am.

This means sinks and water fountains will not work during this period.  Toilets will flush once, but that’s all during the outage period.  Facilities staff will be conducting water system checks immediately following the outage to make sure all our fixtures are working properly.

I’m sorry to have to put you through this – what with the no building heat situation we are already experiencing et al.  But the end result of this work will be improved water services to the campus by the City of San Bruno.

To review our Capital Improvement Program on our District web site, please click on  http://www.smccd.net/accounts/facilities/planconstruct/SKY_Projects_Summary_06.30.04.pdf.

You can also access this web site through our Skyline Home Page  http://skylinecollege.net/  by clicking on ‘Campus Construction updates and parking.’

If you’re just interested in past ‘Construction Notices,’ please click on http://www.smccd.net/accounts/facilities/planconstruct/SKY%20Notices.htm#Campus_Construction_Notices

Please remember to be careful around the construction areas.  Thanks.

Richard Inokuchi

Supervisor of Campus Facilities, Skyline College

3300 College Drive, Building 14     San Bruno, CA   94066

o 650-738-4166     c 650-642-4974     f 650-738-4113

inokuchir@smccd.net